Built for residential remodelers & handyman pros

Create professional
Change Drafts in 30 seconds.

Turn rough job notes into clean, client-ready Change Drafts that help you get approval and avoid lost revenue.

3 free Change Drafts Cancel anytime
Change Draft #CD-1042
Recessed Lighting Add-On
Project: Hayes Kitchen Remodel · Apr 28, 2026
Draft
Customer
M. Hayes
Original Contract
$28,400
Effective
Apr 30, 2026
Scope of Work

Install four (4) recessed LED downlights in kitchen ceiling, including drywall patch, paint touch-up, and final dimmer wiring. All work to match existing finishes.

Item
Qty
Amount
Materials
$480.00
Labor
$950.00
Total Change Amount
$1,430.00
Schedule impact: +2 daysGenerated in 28s
The Problem

Job changes happen fast. Paperwork doesn't keep up.

Undocumented changes cost you money.

Verbal sign-offs disappear when invoices show up. You eat the labor and materials.

Messy paperwork slows down approvals.

A scribbled note on a job folder is not something a homeowner is going to sign quickly.

Weak wording creates client disputes.

Vague scope and missing exclusions are how small change orders turn into big arguments.

How it works

From rough notes to a signed Change Draft, in three steps.

  1. 1
    Enter your rough notes and costs

    Type what you'd say to your foreman. Material, labor, days added.

  2. 2
    Generate a professional Change Draft

    Clear scope, clean cost breakdown, schedule impact, and an approval block — instantly.

  3. 3
    Download the PDF and send to your client

    Branded with your logo. Looks like something a lawyer would send. Gets signed faster.

Before / After

Same change. Two very different documents.

Before
Job folder note
“Customer wants 4 recessed lights, drywall patch, about $480 materials, $950 labor, adds 2 days.”
No scope detail
No exclusions
No signature line
After · Change Draft
Recessed Lighting Add-On
Hayes Kitchen Remodel · Effective Apr 30, 2026
Total
$1,430.00
Scope of Work

Install four (4) recessed LED downlights in kitchen ceiling. Includes drywall cut-in, patch, sand, prime, and paint touch-up to match existing ceiling. Final wiring to existing dimmer circuit.

Materials
$480.00
Labor
$950.00
Schedule Impact
+2 days
Exclusions
Ceiling repaint outside patch zone.
Approved by Client
Signature & Date
Approved by Contractor
Signature & Date
Built for the field

No complicated setup. Works in minutes.

Built for small contractors who are tired of paperwork. Open the app, enter your notes, send a clean Change Draft. That's it.

30s
to a finished draft
$0
to start
PDF
branded export
Pricing

Try it free. 3 Change Drafts on us.

Simple plans. Cancel anytime. No setup fees.

Free
No card required
$0/forever
Try it before you decide.
  • Up to 3 Change Drafts
  • PDF export
  • Company branding
Start Free
Solo
Most Popular
$29/month
Founding rate: $19/mo for the first 20 users.
  • Unlimited Change Drafts
  • Branded PDF export
  • Saved project history
  • One-click “Make More Formal” / “Add Exclusions”
Get Solo — $29/mo